The building modifications were carried out on the entire area of the current building envelope of buildings D and E. The building envelope was insulated with wall panels with a mineral wool core. Also, a complete replacement of non-compliant filler panels with new ones was carried out. The lower part of the building was fitted with the ETICS insulation system and the roof was supplemented with new insulation.