Menu
  • English
    • Czech
    • German
    • Polish
    • Serbian

References

Home / References / Machinery division

Delivery and installation of new hot water pipeline in Děčín Hospital

MAZA OXA shutdown

Extension of floating pipeline with water mixtures

PEC BA 111 – Foam-water monitors

Reconstruction of overhead distribution lines in Kralupy tank ST 211

Reconstruction of overhead distribution lines in Kralupy tank ST 108

Repair of flue pipe on K5

Operation test of equipment

Replacement of part of pipe branch 1530-LS695 (condensate)

Asphalt oxidation operating unit shut-down

Installation of fibreglass pipeline