Investor:
ORLEN Unipetrol RPA s.r.o.
Implementation deadline:
2022 – 2023

Dismantling, cleaning and assembly of reactors R01 and R02, DN400 off-gas piping, filters FF01 and FF02, tanks H01-04, (some of them had to be transported from the site for more thorough cleaning on the cleaning site), everything was transported here for cleaning.

Dismantling, inspection and installation of fittings DN25-DN200 + PV and RV.

Opening of furnace B01 (inspection) and dismantling, removal, cleaning and reassembly of heat exchangers E01-E04 (8 items in total). As part of this, pressure tests (TZ) were carried out including minor repairs such as fitting replacements, repairs to broken pipes, and the manufacture and installation of new heating pipes were also provided.