Menu
  • English
    • Czech
    • German
    • Polish
    • Serbian

Construction of a workout playground, balancing trail and game boat on Lake Most

Home / References / Construction division / Construction of a workout playground, balancing trail and game boat on Lake Most
#
#
#
#
Investor:
Statutory city of Most
Implementation deadline:
August 2020 – November 2020

The shipwreck consists of bows, a central section with a viewing basket, complete with balancing logs and low rope obstacles, and a stern connected by gangways with a lighthouse with a space net and a slide.

The balancing trail consists of 13 parts with varying difficulty, with transition blocks placed between the parts as needed.

The shipwreck and the balancing path are installed on a sand drop area.

The exercise set consists of handstands, ladders, high, medium and low trapezes and is mounted on a cast drop surface.