Production of weldments for exchanger flue
Delivery and installation of new hot water pipeline in Děčín Hospital
Tenba Litvínov Sports Hall
Warehouse Hall – Kadaň Shipyard
Roofing of the silo pit in Bukovna
Riding hall and hay storage
Manufacture of roof lattice steel structures
Production of advertising frames
Renovation and ventilation of the perimeter wall in Meziboří
Thermal insulation of residential buildings in Košťany
Routine maintenance – insulation
OPEX23 + repair of thermal insulation
Replacement of the 5610-ST28 tank
Wastewater management in the tank farm premises
Relocation of the NDB line from PIB
Replacement of burners on the furnaces of bl. 25
Natural gas distribution optimisation
Extension of floating pipeline with water mixtures
PEC BA 111 – Foam-water monitors
Reconstruction of overhead distribution lines in Kralupy tank ST 211
Reconstruction of overhead distribution lines in Kralupy tank ST 108
Insulation of training centre equipment
Insulation and cladding of tank trucks
Water seal for the intermediate frame of the B2 production unit – Počerady Power Plant
Left and right intermediate frame of the B2 production unit – Počerady Power Plant
Manufacture of sliding gates and stair railings
Repair of ‘SKALKA’ vessel
Stacks and discharge conveyor for bulk material
Repair of flue pipe on K5
Operation test of equipment
Modernisation of the supply water system on PS2533
Turnkey pipe replacement, production unit 25
Replacement of flame-arrester vent plugs and pressure relief valves in Kralupy refinery
Reconstruction of HP part of T700 boilers
Thermal insulation of the building envelope of the Daytime Rehabilitation Centre and Day-Care Centre for children under three years of age in Most
Construction of a workout playground, balancing trail and game boat on Lake Most
Reduction of energy requirements of the 15th Elementary school of Most
CV013100 Kadaň, VDJ Kadaň HTP – reconstruction
Reconstruction of the school workshop ship Děčín
Repair of the Jirkov hot water pipeline
Reconstruction of the DN 300/350 pipeline in the ALFA collector
Production of a floating dock
Supplies of materials and components for suction dredger
Stacks and discharge conveyor for bulk material PORTSAID – BG320 TKF + BG660
Replacement of storage tank level gauges
Replacement of part of pipe branch 1530-LS695 (condensate)
Asphalt oxidation operating unit shut-down
Installation of fibreglass pipeline
HZS Most – parking lot made of interlocking pavement and HZS Litvínov – asphalt road
Revitalisation of the operational and administrative building 1715 (AGRO laboratories) – implementation
Thermal insulation of the cladding and replacement of windows at the Brown Coal Research Institute (VUHU) Most
Reduction of the energy demand of Building No. 3. Elementary school of Most